Permit Status - Vermont 64
Vermont 64 northbound: at I-89
trucker info -- trucks are recommended to avoid the area —
Comment: There are steep grades on Route 64 from I-89 to Williamstown. It's recommended that large trucks use Exit 6 for Williamstown.

last updated October 28
 
Roadwork - Interstate 89
Interstate 89 in both directions: from Exit 5: VT 64 to Exit 16: US 7
work on the shoulder, shoulder closed due to road marking work in progress — for the next three weeks
Comment: Installation of new roadway signs is taking place. Multiple work zones will be encountered and some shoulder and/or lane closurers may take place.

last updated July 28
 
Roadwork - US 2
US 2: at VT 14; Quaker Road
long term road construction, short delays because of a new road layout -- look out for flaggers — starting 5:00 AM, 08/02/10 until July 1, 2011
Comment: Realignment and reconstruction of US2 and VT14 intersection in East Montpelier will begin in early August 2010.

last updated July 29
 
Roadwork - US 302
US 302: at VT 14, VT 62
construction work — starting 6:00 AM, 08/02/10 until December 3
Comment: Reconstruction and traffic signal work will take place in Barre City to include North Main and Route 62, Maple Avenue and Summer Street and Summer and Elm Street. Various lane closures and roadway restricitons will be in place. Traffic shall be maintained for the duration of the project however some delays can be expected. Most of the work will take place from 7AM to 5PM Monday through Friday with some night and Saturday work possible.

last updated July 30
 
Roadwork - Vermont 12
Vermont 12: from North Calais Road to Elmore Pond Road
construction work, single line traffic - alternating directions, delays, speed restrictions in force because the road is being repaved — until October 15
Comment: Project length is approximatly 8 miles from Hancock Brook Road in Worcester north to Lacasse Road in Elmore. Expect multiple work zones. The road surface is rough in places with low shoulders. Vehicles, espicially motorcycles should use extreme caution.

last updated July 9
 
Roadwork - Vermont 14
Vermont 14: from US 2 to VT 214
construction work, traffic restrictions in force due to bridge construction work — until October 1
Comment: This project will resume on 04/28/10 and involves the construction of a new bridge on Route 14 just north of E. Montpelier. A 30 MPH speed limit is advised through the detour with a 40 MPH Limit in the construction zone. The lane width narrows to 11 feet.

last updated April 26
 
Roadwork - Vermont 113
Vermont 113: from VT 110 to VT 244
construction work because the road is being repaved — clearing this month
Comment: Paving work continues as well as side work to include guardrail and ditching.

last updated July 9
 
Alert - Interstate 89
Interstate 89 northbound: between Exit 4: VT 66 and Exit 5: VT 64
rest area closed —

last updated August 11
 
Alert - US 2
US 2: from VT 100 to before Middlesex State Highway
road open to traffic, new road layout —
Comment: New bridge construction is complete on Route 2 just west of Middlesex. The bridge was open to traffic as of 06/23/10. Work will continue in the area on removing the temporary bridge, old abutments, the pier and approaches. Some one-way traffic may be necessary during daytime hours as clearing work progresses.

last updated June 24
 
Alert - US 2
US 2: at Taylor Street
bridge closed because of bridge maintenance work -- follow local detour — until October 27
Comment: The Taylor Street Bridge that spans the Winooski River between Memorial Drive and State Street in the City of Montpelier has been closed effective 02/08/10 and will undergo Rehabilitation of the structure. Work also includes reconstruction of the approaches, replacement of the deck surface, railings & guradrails, reconstruction of the roadway approaches and replacement of the bridge suspended municipal water main. The project is expeced to be completed in late October.

last updated June 3
 
Alert - Vermont 108
Vermont 108: between Barrows Road and Vanat Road
road open to traffic — for the next three months
Comment: Route 108 through Smugglers Notch is open to traffic for the Summer Season. Drive with caution through the narrow & winding section of this roadway. NO TRACTOR TRAILERS.

last updated May 28
bridge closed on US 2 at Taylor Street because of bridge maintenance work -- follow local detour — until October 27 last updated June 3 construction work, single line traffic - alternating directions, delays, speed restrictions in force on Vermont 12 from North Calais Road to Elmore Pond Road because the road is being repaved — until October 15 last updated July 9 work on the shoulder, shoulder closed on Interstate 89 in both directions from Exit 5: VT 64 to Exit 16: US 7 due to road marking work in progress — for the next three weeks last updated July 28 long term road construction, short delays on US 2 at VT 14; Quaker Road because of a new road layout -- look out for flaggers — starting 5:00 AM, 08/02/10 until July 1, 2011 last updated July 29 trucker info on Vermont 64 northbound at I-89 -- trucks are recommended to avoid the area — last updated October 28 construction work, traffic restrictions in force on Vermont 14 from US 2 to VT 214 due to bridge construction work — until October 1 last updated April 26 construction work on Vermont 113 from VT 110 to VT 244 because the road is being repaved — clearing this month last updated July 9 construction work on US 302 at VT 14, VT 62 — starting 6:00 AM, 08/02/10 until December 3 last updated July 30 rest area closed on Interstate 89 northbound between Exit 4: VT 66 and Exit 5: VT 64 — last updated August 11 road open to traffic, new road layout on US 2 from VT 100 to before Middlesex State Highway — last updated June 24 road open to traffic on Vermont 108 between Barrows Road and Vanat Road — for the next three months last updated May 28